Sheet set C · Civil & Earthwork

Earthwork

Excavation, base course, gravel, fill and haul-off.

Issued

5 of 5

Quick reference

Loose weight of one cubic yard, as published by the sources this set cites
Material Condition lb / cu yd Short tons / cu yd
Gravel, 1/4-2 in (screened) Dry, loose 2,850 1.43
Gravel, 1/4-2 in (screened) Wet, loose 3,400 1.7
Gravel, 1/4-2 in (screened) Bank, in the undisturbed deposit 3,200 1.6
Gravel, unsized Dry, loose 2,550 1.28
Gravel, unsized Bank, in the undisturbed deposit 2,850 1.43
Gravel, pit run (bank run) Dry, loose 3,250 1.63
Gravel, pit run (bank run) Bank, in the undisturbed deposit 3,650 1.83
Crushed stone Dry, loose 2,700 1.35
Sand and gravel mix Dry, loose 2,900 1.45
Sand and gravel mix Wet, loose 3,400 1.7
Sand and gravel mix Bank, in the undisturbed deposit 3,250 1.63
Sand Dry, loose 2,400 1.2
Sand Damp, as delivered 2,850 1.43
Sand Wet, loose 3,100 1.55
Sand Bank, in the undisturbed deposit 2,700 1.35
Top soil Dry, loose 1,600 0.8
Top soil Bank, in the undisturbed deposit 2,300 1.15
Earth, loam Dry, loose 2,100 1.05
Earth, loam Bank, in the undisturbed deposit 2,600 1.3
River rock (supplier chart) Damp, as delivered 2,800 1.4
Crushed granite (supplier chart) Damp, as delivered 2,500 1.25
Sand / gravel / DG / rock / river cobble (supplier chart) Damp, as delivered 2,700 1.35

Aggregate weight moves with gradation, moisture and how hard it was compacted. These are published figures from a manufacturer engineering table and two supplier charts, not a measurement of your pile: the full citation for each row is printed on sheet C-101, where you can also type your supplier’s own number in. Materials with no figure in any open document — pea gravel, road base, decomposed granite, asphalt millings, riprap — are listed there without a default on purpose.